Dashboard · Experiments Complete · 66 Tests Passed · v1.0.0
📊 Research Dashboard
Execution state of StructOPE
Snapshot of the protocol's execution status, research questions, and verification records. Figures are derived from executed experiments (Pilot-1, Pilot-2, Confirmatory); no result is projected.
Execution Status
P1
✅
P2
✅
C
✅
V1–V7
✅
Tests
✅
Fault
✅
Verdict
⚠️
Pilot-1 (324 runs), Pilot-2 (540 runs), and Confirmatory (432 runs) are Complete. Separation verification (V1–V7) Passed. Automated test suite: 66 / 66 passed. Fault-injection determinism Verified. Final verdict on ranking fidelity Under Review.
Research Questions (RQ1–RQ6)
| ID | Question | Status |
|---|---|---|
| RQ1 | Does ranking fidelity change when the scenario changes from baseline to a structurally shifted scenario? | Answered |
| RQ2 | Is a drop in ranking fidelity associated with loss of support (low coverage) more than with differences in behaviour? | Answered |
| RQ3 | Do state-conditioned MMD distances separate policies whose behaviour differs from those that differ only in frequency of observation? | Answered |
| RQ4 | Are thresholds calibrated on Pilot scenarios stable when applied to held-out scenarios C3 and C4? | Answered |
| RQ5 | How sensitive are comparability decisions to the zero-support threshold n_min (20, 30, 50)? | Answered |
| RQ6 | Can the fault-injection design generate structural shift deterministically and in the intended severity ranges? | Verified |
"Answered" means the pre-registered condition was met. Caveats are recorded in the Threats to Validity section (T3, T4, T5). The final verdict on RQ1 is under review.
Verification Records
| Check | Description | Status |
|---|---|---|
| V1 | No confirmatory result exists before the freeze timestamp | Passed |
| V2 | Pilot results isolated in results/pilot/ | Passed |
| V3 | Confirmatory results in results/confirmatory/ | Passed |
| V4 | Frozen thresholds match the recorded values | Passed |
| V5 | sha256 digest of R7 specification matches | Passed |
| V6 | Analysis code separated from utility-estimate code | Passed |
| V7 | 66 automated tests pass on the frozen codebase | Passed |
Open Items
| # | Item | Status |
|---|---|---|
| 1 | Independent review of threshold calibration | Open |
| 2 | Independent replication of fault-injection determinism | Pending |
| 3 | Final verdict on ranking fidelity under structural shift | Under Review |
| 4 | HeMAC version stability (results may not transfer to future versions) | Noted |
Decision
(E) Under Review. The pre-registered conditions have been met (RQ1–RQ6 passed, with caveats). The final verdict on ranking fidelity under structural shift is being prepared. This is not a pass or a failure; it is a recorded state that names what is verified and what remains open.