Dashboard · Experiments Complete · 66 Tests Passed · v1.0.0

📊 Research Dashboard

Execution state of StructOPE

Snapshot of the protocol's execution status, research questions, and verification records. Figures are derived from executed experiments (Pilot-1, Pilot-2, Confirmatory); no result is projected.

Execution Status

P1
✅
P2
✅
C
✅
V1–V7
✅
Tests
✅
Fault
✅
Verdict
⚠️

Pilot-1 (324 runs), Pilot-2 (540 runs), and Confirmatory (432 runs) are Complete. Separation verification (V1–V7) Passed. Automated test suite: 66 / 66 passed. Fault-injection determinism Verified. Final verdict on ranking fidelity Under Review.

Research Questions (RQ1–RQ6)

IDQuestionStatus
RQ1Does ranking fidelity change when the scenario changes from baseline to a structurally shifted scenario?Answered
RQ2Is a drop in ranking fidelity associated with loss of support (low coverage) more than with differences in behaviour?Answered
RQ3Do state-conditioned MMD distances separate policies whose behaviour differs from those that differ only in frequency of observation?Answered
RQ4Are thresholds calibrated on Pilot scenarios stable when applied to held-out scenarios C3 and C4?Answered
RQ5How sensitive are comparability decisions to the zero-support threshold n_min (20, 30, 50)?Answered
RQ6Can the fault-injection design generate structural shift deterministically and in the intended severity ranges?Verified
"Answered" means the pre-registered condition was met. Caveats are recorded in the Threats to Validity section (T3, T4, T5). The final verdict on RQ1 is under review.

Verification Records

CheckDescriptionStatus
V1No confirmatory result exists before the freeze timestampPassed
V2Pilot results isolated in results/pilot/Passed
V3Confirmatory results in results/confirmatory/Passed
V4Frozen thresholds match the recorded valuesPassed
V5sha256 digest of R7 specification matchesPassed
V6Analysis code separated from utility-estimate codePassed
V766 automated tests pass on the frozen codebasePassed

Open Items

#ItemStatus
1Independent review of threshold calibrationOpen
2Independent replication of fault-injection determinismPending
3Final verdict on ranking fidelity under structural shiftUnder Review
4HeMAC version stability (results may not transfer to future versions)Noted

Decision

(E) Under Review. The pre-registered conditions have been met (RQ1–RQ6 passed, with caveats). The final verdict on ranking fidelity under structural shift is being prepared. This is not a pass or a failure; it is a recorded state that names what is verified and what remains open.